Hinkley Lighting Edgewater 1683BK Käyttöohje

Hinkley Lighting Helpotus Edgewater 1683BK

Lue alta 📖 käyttöohje suomeksi merkille Hinkley Lighting Edgewater 1683BK (2 sivua) kategoriassa Helpotus. Tämä opas oli hyödyllinen 2 henkilölle ja sai 4.5 tähden keskimäärin 2 käyttäjältä

Sivu 1/2
a emb instruct nsss ly io
Item No. 1683
1. Find a clear area in which you can work.
2. Unpack fixture and glass from carton.
3. Carefully review instructions prior to assembly.
1. Prepare gem strap for mounting by threading two screws provided into (A) (B)
back of gull wing bracket of gem strap - see .(A) Drawing 1
Be sure the holes into which the screws are threaded match the spacing of holes (D)
in the ceiling pan - see .(1) Drawings 1 and 2
3. Mount gem strap to junction box , using the two 1” screws not provided.(A) (J) (C)
Make electrical connections from supply wire to fixture lead wires. Refer to instruction
sheet and follow all instructions to make all necessary wiring connections. Then(I.S. 18)
refer back to this sheet to continue installation of this fixture.
1. Hang the fixture by slipping the holes in the ceiling pan over the screws (D) (1) (B)
in the mounting strap - see .(A) Drawing 2
2. Thread on ball knobs to secure fixture to the ceiling.(F)
1. Before installing glass, fixture can now be lamped accordingly.
2. To install bottom panel of glass , thread nipple into coupler .(2) (3) (4)
3. Slip glass panel over nipple and hold in place.(2) (3)
4. Thread knob onto nipple and hand tighten only.(5) (3)
Note: tightening with a tool may cause damage to glass.
*** The construction of this fixture will be accomplished by first mounting the
mounting strap to the junction box, making all necessary electrical connections,
hanging the fixture from the ceiling, and then installing the glass.
start here
1683
SAFETY WARNING: READ WIRING AND GROUNDING INSTRUCTIONS (I.S. 18)
AND ANY ADDITIONAL DIRECTIONS. TURN POWER SUPPLY OFF DURING
INSTALLATION. IF NEW WIRING IS REQUIRED, CONSULT A QUALIFIED
ELECTRICIAN OR LOCAL AUTHORITIES FOR CODE REQUIREMENTS.
Drawing 2 - Fixture Mounting
Drawing 3 - Glass Installation
B
1
2
3
5
4
D
F
J
C
A
1
Drawing 1 - Strap Detail
B
(side view)
gull wing
bracket
B
4.2.08
H I N K L E Y L I G H T I N G 33000 Pin Oak Parkway Avon Lake, OH 44012 800.446.5539 / 440.653.5500 hinkleylighting.com
REVISION 1
I.S. 18 wiring grounding instructions
SAFETY WARNING: READ WIRING AND GROUNDING INSTRUCTIONS (I.S. 18)
AND ANY ADDITIONAL DIRECTIONS. TURN POWER SUPPLY OFF DURING
INSTALLATION. IF NEW WIRING IS REQUIRED, CONSULT A QUALIFIED
ELECTRICIAN OR LOCAL AUTHORITIES FOR CODE REQUIREMENTS.
wiring instructions
Indoor Fixtures
1. Connect positive supply wire (A) (typically black or the smooth, unmarked
side of the two-conductor cord) to positive fixture lead with appropriately (B)
sized twist on connector - see .Drawings 1 or 2
2. Connect negative supply wire (typically white or the ribbed, marked (C)
side of the two-conductor cord) to negative fixture lead .(D)
3. Please refer to the below to complete all grounding instructions
electrical connections.
Outdoor Fixtures
1. Connect positive supply wire (A) (typically black or the smooth unmarked
side of the two-conductor cord) to positive fixture lead with appropriately (B)
sized twist on connector - see . Drawings 2 or 3
2. Connect negative supply wire (typically white or the ribbed, marked (C)
side of the two-conductor cord) to negative fixture lead .(D)
3. Cover open end of connectors with silicone sealant to form a watertight seal.
If installing a wall mount fixture, use caulk to seal gaps between the fixture
mounting plate (backplate) and the wall. This will help prevent water from
entering the outlet box. If the wall surface is lap siding, use caulk and a
fixture mounting platform specially.
4. Please refer to the below to complete all grounding instructions
electrical connections.
grounding instructions
Flush Mount Fixtures
For positive grounding in a 3-wire electrical system, fasten the fixture ground
wire (typically copper or green plastic coated) to the fixture mounting strap (E) (1)
with the ground screw - see . (2) Drawing 1
Note: On straps for screw supported fixtures, first install the two mounting screws in strap.
Any remaining tapped hole may be used for the ground screw.
Chain Hung Fixtures
Loop fixture ground wire (typically copper or green plastic coated) under the (E)
head of the ground screw on fixture mounting strap and connect to the (2) (1)
loose end of the fixture ground wire directly to the ground wire of the building
system with appropriately sized twist-on connectors - see .Drawing 2
Post-Mount Fixtures
Connect fixture ground wire (typically copper or green plastic coated) to power (E)
supply ground with appropriately sized twist-on connector inside post. Cover open
end of connector with silicone sealant to form a watertight seal - see .Drawing 3
Drawing 1 - Flush Mount
Drawing 2 - Chain Hung
supply wire
fixture leads
twist-on
connectors
Drawing 3 - Post-Mount
twist-on
connectors
1
A CC
B D
supply wire
fixture leads
A C
B D
1
2
supply wire
fixture leads
A C
B D
twist-on
connectors
E
2
E
E
E
E
I.S. 18
H I N K L E Y L I G H T I N G 33000 Pin Oak Parkway Avon Lake, OH 44012 800.446.5539 / 440.653.5500 hinkleylighting.com

Tuotetiedot

Merkki: Hinkley Lighting
Kategoria: Helpotus
Malli: Edgewater 1683BK

Tarvitsetko apua?

Jos tarvitset apua merkille Hinkley Lighting Edgewater 1683BK esitä kysymys alla ja muut käyttäjät vastaavat sinulle




Helpotus Hinkley Lighting Käyttöohjeet

Helpotus Käyttöohjeet

Viimeisimmät Helpotus Käyttöohjeet